Skip to content

Quality

What a pre-shipment inspection actually covers

Buyers often appoint a surveyor without agreeing what the surveyor is being asked to do. The scope is a decision, and it is worth making deliberately.

· 3 min read · Globiq Impex

Appointing a third-party inspector is normal practice and no reputable exporter should object to it. But "we will send SGS" is not yet an instruction. Inspection bodies offer several distinct services, they are priced separately, and the one you most need is not always the one that gets booked.

Here is what the scopes actually are, and the questions worth settling before the surveyor is instructed.

The separable pieces

  • Sampling. A surveyor attends the warehouse and draws samples to an agreed pattern. This is the foundation of everything else and the part most often left vague.
  • Laboratory analysis. The drawn sample is tested against named parameters — moisture, purity, protein, oil content, fibre, aflatoxin, pesticide residue. Each parameter is a separate test with its own cost and turnaround.
  • Packing and marking check. Confirmation that bag weights, bag type, liners, labelling and shipping marks match the contract. Cheap, and it catches the errors that cause the most annoyance on arrival.
  • Loading supervision. The surveyor is present while the container is stuffed, verifies quantity, checks container condition and cleanliness, and witnesses the seal being applied. The seal number goes into the report.
  • Certification. A formal certificate of inspection or analysis, sometimes required by the destination customs or by the terms of a letter of credit.

The sampling plan is the part that matters

A laboratory result is only as good as the sample it was run on. If twenty tonnes are represented by material scooped from three bags near the door, the certificate is precise about something that may not describe the consignment.

Agree the pattern in advance: how many bags are sampled, how they are selected, how the increments are combined and reduced, and how much material is retained. A surveyor will follow a recognised sampling standard if you ask for one; left unspecified, practice varies.

This is also why we keep a retained sample from every lot we ship, held at our office for the life of the contract. If a buyer questions what arrived, the argument is settled against physical material rather than two conflicting memories.

Decide the failure path before you need it

The question nobody asks until it is urgent: what happens if a result comes back outside specification?

There are several reasonable answers — reprocess and retest, replace the lot, ship at a renegotiated price, or cancel. What is not reasonable is discovering that the contract is silent while a container is booked and a vessel is closing.

Settle it in the contract: who pays for the retest, how many retests are allowed, what tolerance triggers rejection rather than renegotiation, and who bears the demurrage if the shipment slips as a result.

Timing

Book the surveyor against the loading window, not the contract date. Lab turnaround for residue and aflatoxin testing is measured in days, not hours, and a certificate that arrives after the vessel has sailed has cost you money without protecting anything.

If your letter of credit requires an inspection certificate as a presentation document, check the required issue date against the shipment date before the credit is opened. Mismatches there are a common and entirely avoidable cause of discrepant documents.

Start an enquiry

Tell us the commodity, grade and destination.

Send a specification and we will come back with a written offer, an indicative price and a loading window — usually within one working day.